An exceptional pool is never the result of a single decision. It is the outcome of a considered pool design process, in which each phase builds on the one before, from the first conversation to the documentation that takes the project to site.

Understanding how pool design works matters, whether you are a private client, an architect or a developer.

It is what allows an idea to be transformed into a project that is technically defined and ready for execution, and it is the core of our approach to project design.

Below we walk through the general phases of designing a bespoke pool and explain what each one resolves and why it matters.

We invite you to read on.

Why the pool design process matters

It is tempting to jump straight to the appealing part of pool design: the shapes, the finishes, the first render.

➜ But well-defined projects share a common foundation: a structured process that allows architectural and technical decisions to be developed and coordinated progressively, in which decisions are developed and validated step by step.

The early phases make it possible to study and adjust many decisions before reaching the site, when introducing changes tends to be more complex and costly.

Leaving relevant aspects undefined can carry decisions over into the construction phase, where resolving them is generally more complex.

This is why a methodology is what allows creativity and technical rigour to work together in bespoke pool design, coordinating architecture, engineering and execution from the earliest stages, the same principle that underpins our Architecture of Water approach.

From design to execution: the phases of a pool project

The development of a bespoke pool can span different phases, from the initial definition and design to the technical development and, when the scope of the project includes it, the execution and commissioning.

➜ The precise scope depends on the service contracted: GodoPools can develop only the design project and its technical documentation, accompany the team during execution, or also take on the construction of the project.

The table below summarises the phases, and the sections that follow explore each one.

Phase of a pool project What it resolves
1. Initial consultation Understanding the vision, the site, the lifestyle and the goals that shape a bespoke pool design.
2. Design development Conceptual direction and 3D visualisations that anticipate the aesthetics, proportions, materials and relationship with the setting.
3. Technical planning Structural and hydraulic development, material specification and coordinated technical documentation.
4. Execution, when part of the scope Construction of the project and coordination of the teams involved.
5. Commissioning and handover When GodoPools executes the project, checking of systems, technical handover and bringing the installation into operation.

Phase 1: initial consultation

Every bespoke pool design begins with understanding the project.

In this first phase we explore the client’s vision, their needs, their lifestyle and the characteristics of the space.

The aim is to lay the foundations of a genuinely personalised project, conceived from scratch and adapted to the context, use and conditions of each project.

It is also the moment to raise the essential questions early. For example, how the water will relate to the architecture and the setting, how the space will be used and what will define the experience.

The clearer this phase, the more coherent the pool design that follows.

Phase 2: design development and 3D visualisation

With the brief understood, the team of architects and engineers defines the conceptual direction, develops the pool design and creates 3D visualisations that make it possible to anticipate the aesthetics, the proportions, the materials and the relationship of the pool with its setting.

➜ Seeing the space before it exists is far more than a presentation tool.

It allows decisions about proportion, materials, levels and the relationship with the surroundings to be studied and refined before reaching site, something especially valuable in luxury pool design, where every detail counts.

On projects that require it, this phase can draw on a prior feasibility study to analyse technical conditions before developing the design.

Our guide to the luxury pool feasibility study looks at this pre-project stage.

Phase 3: technical planning and documentation for execution

This is where the concept becomes a project that is technically defined and ready for execution.

In the technical planning phase we develop the structural and hydraulic engineering, specifying the materials, and produce the coordinated technical documentation the pool design needs to be executed with precision.

The hydraulic engineering, the overflow and treatment circuits, the balance system and the plant room are resolved and coordinated with the architecture, the structure and the waterproofing.

➜ The plans are the result of this work, not the work itself.

As we explain in our article on infinity pool design plans, the value of the design lies in the technical development and coordination behind the documentation, which is what allows the project to be built as it was conceived.

Phase 4: execution phase

Once the technical project is complete, the execution phase begins.

Depending on the contracted scope, GodoPools can take on the construction or provide technical support to the client, architect or execution team, to help the solutions defined in the project be translated correctly to site.

Good documentation eases this coordination considerably, but it works best alongside experienced professionals.

The precision an architectural pool design demands, particularly at overflow edges and technical interfaces, calls for teams who understand these systems.

When GodoPools takes part in the execution or site coordination, this phase incorporates technical monitoring and control of the solutions defined in the project.

For clients who already have a concept or an existing pool design, this is also the phase in which specialist technical pool consultancy can review and strengthen the project before and during execution.

Phase 5: commissioning and handover

Spa Hotel Alanda

When GodoPools takes on the execution of the project, the final phase includes the commissioning and checking of the systems, as well as the technical handover to the client or the team responsible for maintenance.

A pool project does not end when the pool is filled. In these cases we provide the agreed follow-up to support the correct operation and maintenance of the installation, and this closing phase reflects how the whole design process has been conceived, with the long term in mind.

From phased design to one coordinated project

The value of the process lies not only in each phase, but in the coordination between all of them.

The design, engineering and execution decisions should be understood as parts of the same project, and that difference is what distinguishes good pool design from a mere sum of decisions.

➜ This is the essence of our approach: integrating design, engineering, technology and execution from the earliest phases, so the result is coherent with the architecture, the setting, the experience of use and the operational needs of the space.

Approached this way, pool design is not a formality to move through.

It is the tool that allows the intent of the project to be maintained and uncertainties to be reduced, from the earliest decisions through to execution.

Conclusion

A well-run pool design process is what turns an idea into a project that is technically defined and ready for execution.

From the initial consultation to final handover, each phase makes it possible to define and coordinate decisions that, if postponed, can generate interferences or changes during execution. It is one of the foundations of our project design service.

At GodoPools we develop and validate Architecture of Water solutions from an architectural, hydraulic and constructive perspective, producing the technical documentation needed to take each project to site rigorously.

Whether you are developing a private residence, a hotel, a resort or a high-end wellness space, our team can help you define the design and technical strategy from its earliest phases, develop the documentation needed for execution and, depending on the scope of the project, accompany or also take on its construction. Contact us here.

Frequently asked questions (FAQs)

➜ What are the phases of the pool design process?

The process can span from the initial consultation, the conceptual design and the technical development through to execution and commissioning.

The precise scope depends on each project and the service contracted. GodoPools can develop the design and technical documentation, accompany the execution, or also take on the construction.

➜ How long does the design of a bespoke pool take?

It depends on the complexity of the project, the site conditions and the level of customisation. Rather than a fixed timeline, the duration is defined in the early design phases, once the scope and conditions are understood.

➜ What is the difference between design development and technical planning?

Design development defines the concept, the aesthetics and the experience through 3D visualisations.

Technical planning develops the structural and hydraulic engineering and produces the coordinated documentation needed to build the pool.

➜ Do I need an architect and a pool specialist?

On complex architectural projects, coordination between the architecture team and pool specialists is particularly important.

The scope of each professional depends on the project, but aspects such as structure, hydraulics, waterproofing, installations and architecture should be developed in a coordinated way.

At GodoPools we can collaborate with the architect and technical teams from the earliest phases, or develop the project within the contracted scope.